AHU Replacement at Al Husn Mess

Posted Date : 30 Aug, 2023


Description


We have supplied 3 air handling units (83.3TR) for Royal Guard of Oman at Al Husn Mess. The units were supplied in semi-knocked down condition from factory due to site constraint. The scope of works included ahu assembly, chilled water piping and insulation, ducting works, valve replacement, electrical and control panel replacement.